Accelerating Decarbonisation

We are decarbonising our operations with clarity, precision and impact.

Real Zero, Not Net Zero

We are committed to Real Zero – not net zero, not carbon offsets, but zero fossil fuel use across our Australian terrestrial iron ore operations (Scope 1 and 2) by 2030. This means real, measurable reductions in operational emissions.

We’re a major emitter today, and we don’t shy away from that. Just as we once defied the odds in iron ore, we will do it again, proving that decarbonising heavy industry at scale is possible and profitable.

20250720 - Christmas Creek Corporate Shoot (32).jpg

Taking action now

Explore our Green Grid

Targeting completion in 2028, our Green Grid integrates 1.5GW solar, 800MW wind and 5GWh battery storage to power our Pilbara Operations and service growing demand for green power in the Pilbara, optimised through AI-supported energy management systems.

Product

Type

Status

Information, capacities and positions shown on this map are indicative only and for marketing purposes. Do not rely on this map for investment advice. All projects are subject to Final Investment Decision (FID). Visit the Fortescue Investor Centre for the latest information and disclosures. Projects that are in 'scoping' phase are subject to Final Investment Decision (FID).

Electrifying our mining equipment

We are replacing our diesel powered mining equipment with zero emissions alternatives at scale.

We're working with our global partners to deploy around 800 pieces of battery-electric heavy mobile equipment. Electric excavators, drills and locomotives are already operating on our sites and our battery-electric haul trucks are in early production.

To support this large-scale deployment, we are upgrading site electrical infrastructure, installing charging systems and integrating zero-emissions equipment with our renewable energy and battery storage network.

Powering our operations with renewable energy

Decarbonisation at scale requires firm, reliable, 24/7 energy. That is why we are accelerating delivery of the world's first industrial and fully integrated green energy grid dedicated to eliminating fossil fuels from large-scale industry. This renewable energy network will link our operational sites with renewable generation and battery storage to enable the seamless delivery of renewable electricity across the Pilbara.

Once complete, the network will span more than 620 kilometres of high voltage transmission lines, supported by 1.2GW of solar capacity, more than 600MW of wind generation, and 4-5GWh of battery energy storage. We’re already generating an initial 100MW of solar power from our North Star Junction solar farm, that will be supported by a recently installed 250MWh battery energy storage system. We have also delivered a 120MWh battery energy storage system at Eliwana.

Further expanding the network, we have our 133MW Nullagine Wind project, our 690MW Turner River solar farm, and our 190MW solar farm and 650MWh battery energy storage system at Cloudbreak, all under construction.